APPLICATION / 01
New treatment lines
Start with average and peak net flows, raw-water variability and the required sampling point.
APPLICATIONS
Municipal treatment planning for new capacity, phased retrofits and variable source water. Compare pretreatment, membrane duty and the interfaces to your existing plant.
SITE PLANNING
APPLICATION / 01
Start with average and peak net flows, raw-water variability and the required sampling point.
APPLICATION / 02
Set the offline window for each tie-in and name the party responsible for temporary supply.
APPLICATION / 03
Define pretreatment and response logic for the feed conditions that limit membrane production.
SYSTEMS AND COMPONENTS
01 / Engineered system
A treatment train for river or reservoir sources requiring solids control and a defined downstream disinfection barrier.
View details02 / Engineering service
A staged engineering option for utilities that need to maintain supply during installation and commissioning.
View details03 / Application package
A rural treatment configuration that pairs local production with storage, operating procedures and sampling access.
View detailsPROJECT ENQUIRY
Include the existing process diagram, tie-in windows, spare hydraulic head and continuity plan.
Discuss your project