01MUNICIPAL WATER ENGINEERING

Design around the water source and the network.

Municipal treatment planning for new capacity, phased retrofits and variable source water. Compare pretreatment, membrane duty and the interfaces to your existing plant.

Representative Municipal Water Treatment equipment or application

Product range

Featured equipment

Project preparation

How we review equipment requirements

01

Define the duty

Share the source water, target quality, design flow and expected operating schedule.

02

Review the installation

Include the available footprint, power supply and connection requirements.

03

Confirm the scope

Ask for the proposed equipment list, service access and documentation for the selected configuration.

Applications

Industrial applications

Municipal Water Treatment equipment

New treatment lines

Start with average and peak net flows, raw-water variability and the required sampling point.

View applications
Municipal Water Treatment equipment

Capacity upgrades

Set the offline window for each tie-in and name the party responsible for temporary supply.

View applications
Municipal Water Treatment equipment

High-turbidity events

Define pretreatment and response logic for the feed conditions that limit membrane production.

View applications

HOSON blog

Technical guides

Project enquiries

Share your technical requirements

Share your site conditions and performance targets so the team can review equipment options with you.

Request a quote